Proyecto El Granadillo-Nahuaterique/Honduras

Posted on by Diana Calix

 Update El Granadillo -Nahuaterique

August 15th The water system is complete and operational
First Day, June 25

As a first step, the water board and ADEC conducted an inspection with the contractor to verify what the improvements are to be made to the water system of El Granadillo, we visited the Water source, Conduction Line  and Tank.

Category: Circuit Rider Reports

Tags:

Leave a Reply